Billet handling

Project descriptionThe project request included a handling equipment for steel billets. WeSolve AB/PROAC AB did all engineering and manufacturing in this project. Some of the manufacturing was done here in Birsta, Sundsvall and some of it was manufactured abroad. But we

Loading equipment

Project descriptionTo engineer a new loading equipment to a steel plant. This facility was in need of a completely new lifting wagon. This wagon needed to be able to lift a steel wire ring, with the weight of up to 3600

Steel handling equipment

Project descriptionThe project request included engineering and manufacturing of a steel handling facility. It was a combined master- and sub-bundle handling plus a bar bending machine. WeSolve AB/PROAC AB attended several project meetings at the costumer which was located outside of

Lifting yoke

Project descriptionThe costumer had problems with an existing lifting yoke. WeSolve AB/PROAC AB engineered a new lifting yoke and made all necessary calculations and documentation for CE-marking of the lifting yoke. WeSolve AB also handled the test lifting and the

Complete finishing end line

Project descriptionA complete finishing end line also including retractable stop for the cold shear. (The line is not yet delivered.)Services in this project ​WeSolve ABPROAC ABEngineeringProject ManagementManufacturingInstallation at site Project Gallery         

Offline hexagon Stacker

Project descriptionThis is an offline hexagon stacking equipment that has been developed by WeSolve AB. The product has been engineered to be driven by electrical system or hydraulic system. This machine equipment was developed for straight rounds and/or hexagonal bars up to

Collecting roller table

Project descriptionA new collecting roller table for rectangular stacking with adjustable side rollers was made to an existing finishing end. Due to the angles of the existing lowering arms, the collecting roller table was set in the same angle to

Hexagon stacking equipment

Project descriptionInquiry was regarding a finishing end for rounds of diameter 80 mm to 200 mm with length 3,5 m to 10,3 m. The handling system was to the set inline with the casting. The bundles was to have an

Former for flat products

Project descriptionNew former, in this specific case it was for flat products.  This was developed to handle rectangular bundle sizes with a width in between 145 mm to 975 mm. On top of this a heavy duty stop was integrated

Roll transport wagon